Belfast City Centre

This project required significant adaptation to meet the future needs. At basement level a kitchen facility was created and storage areas using the existing layout.  At ground floor level the existing banking hall was converted into the new Welcome Centre. This required the removal of existing internal division and finishes and their replacement with a … Continue reading Belfast City Centre